Log in | Sign Up

Lane Closure Planned On I-70 EB At Stan Musial Veterans Memorial Bridge In St. Clair Country

Dawn Johnson
Save
Listen to the story

FAIRMONT CITY – The Illinois Department of Transportation today announced lane restrictions will be encountered on eastbound I-70 beginning Monday, August 5, 2024, at 7 a.m. through Thursday, August 9, 2024, at 4 p.m. Weather permitting, the right lane will be closed between the Stan Musial Veterans Memorial Bridge and the on ramp from Packers Ave. All entrance and exit ramps at Packers Ave will remain open.

Get The Latest News!

Don't miss our top stories and need-to-know news everyday in your inbox.

Sign in to hide this notification.

These restrictions are needed to do drainage repair work. IDOT Day Labor forces will make the needed improvements. Full access will be restored as soon as possible.

Article continues after sponsor message
Limited spots available - advertise with us today!

Motorists can expect delays and should allow extra time for trips through this area. To avoid the work area, when feasible, use of alternate routes should be considered. Drivers are urged to pay close attention to changed conditions and signs in the work zones, obey the posted speed limits, refrain from using mobile devices and be alert for workers and equipment.

Prefer RiverBender on Google
Copyright 2026 Riverbender.com. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

 

  • Most Popular
  • Top Stories
  • Most Recent
Menu

Get the RiverBender App

Follow Us

Copyright © 2026 RiverBender.com All rights reserved.

primary

Privacy Policy | Editorial Policy | Fulfillment Policy