Log in | Sign Up

Lane Closures on Clark Bridge Ahead: Expect Delays Starting June 17

Save
Listen to the story

ALTON – Beginning Monday, June 17, 2024, motorists will endure delays with lane restrictions planned for southbound U.S. Route 67 at the Clark Bridge.

Get The Latest News!

Don't miss our top stories and need-to-know news everyday in your inbox.

Sign in to hide this notification.

The Illinois Department of Transportation (IDOT) has announced lane restrictions on southbound US 67 (Clark Bridge) for Monday, weather permitting.

Article continues after sponsor message
Reach Your Local Community with Us - advertise today!

"The left lane on the Illinois Approach of the Clark Bridge will be closed, as well as the left turn lane at Illinois 143 (Landmarks Boulevard), preventing access onto the Clark Bridge from the south," IDOT's Joe Monroe said. "However, access onto the bridge will remain available from the north using the right turn lane at the intersection with Illinois-143 (Landmarks Boulevard).

"The restrictions are necessary for IDOT District 8 Operations forces to perform crack sealing operations on the bridge near the intersection. Full access will be restored as soon as possible."

Monroe continued and said: "Motorists are advised to allow extra time for trips through this area and to consider using alternate routes when feasible. Drivers should pay close attention to changed conditions and signs in the work zones, obey posted speed limits, refrain from using mobile devices, and remain alert for workers and equipment."

For updates from IDOT District 8, follow @IDOTDistrict8 on X, formerly known as Twitter, or view area construction details on IDOT’s traveler information map on https://www.gettingaroundillinois.com/.

Prefer RiverBender on Google
Copyright 2026 Riverbender.com. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

More like this:

Madison County: Lane Closures on Southbound I-255 Over IL 162 April 28-30, 2026
Apr 27, 2026
Cook Street In Godfrey To Close For Reconstruction Starting May 26, 2026
May 21, 2026
Lane Closures On I-255 in Madison County Begin June 3, 2026
May 27, 2026
Ramp Openings And Closures Scheduled At I-64 And Illinois 159 In St. Clair County
6 days ago
Lane Closures On Northbound I-55 In St. Clair County
Yesterday

 

Menu

Get the RiverBender App

Follow Us

Copyright © 2026 RiverBender.com All rights reserved.

primary

Privacy Policy | Editorial Policy | Fulfillment Policy