Log in | Sign Up

Leclaire Lake bank work begins Monday, will cause road closures to Aug. 25

Save
Listen to the story

EDWARDSVILLE - Lake Drive from Hale Avenue to Madison Avenue in Edwardsville will be closed for construction of a retaining wall along the Eastern bank of Leclaire Lake beginning Aug. 7, 2017, through Aug. 25, 2017.

Kelller Construction Co. is doing the project. The work will remedy erosion issues along the lake shore, which have since compromised the existing fence and sidewalk along Madison Avenue, David Sirko, P.E., assistant city engineer, said.

Get The Latest News!

Don't miss our top stories and need-to-know news everyday in your inbox.

Sign in to hide this notification.

Article continues after sponsor message
Connect with Riverbend Readers - advertise with us today!!

Sirko advised motorists to use alternate routes and access to residential properties within closure will be maintained.

“The city appreciates the cooperation of all residents during this process,” he said.

Please contact Edwardsville Public Works at (618) 692-7535 with any questions.

Prefer RiverBender on Google
Copyright 2026 Riverbender.com. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

More like this:

Edwardsville Crews Pour New Sidewalk Concrete On North Main
May 14, 2026
Lanes Reopening Where Possible For Memorial Day Holiday Travel
May 21, 2026
Illinois Waterfowl Blind Drawings Sites And Schedule Released For 2026 Season
Jun 17, 2026
Woman Dies in Spanish Lake Drowning Incident
Apr 27, 2026
Madison County: Lane and Ramp Closures on Northbound and Southbound I-255
6 days ago

 

Menu

Get the RiverBender App

Follow Us

Copyright © 2026 RiverBender.com All rights reserved.

primary

Privacy Policy | Editorial Policy | Fulfillment Policy