Log in | Sign Up

Rep. Kelly Celebrates Groundbreaking Of Dixmoor Water Infrastructure Project

Save
Listen to the story

DIXMOOR, Ill. - In case you missed it, Congresswoman Kelly was joined by Congressman Jonathan Jackson, Cook County Board President Toni Preckwinkle, the Army Corps of Engineers, and the Village of Dixmoor to break ground on a new water main project. Largely supported by federal funds secured, in-part by Rep. Kelly, Dixmoor’s new water main would preserve and protect the village’s critical water supply.

Get The Latest News!

Don't miss our top stories and need-to-know news everyday in your inbox.

Sign in to hide this notification.

Article continues after sponsor message
Learn about our advertising opportunities!

Dixmoor’s water main infrastructure project is planned to build a 3,700 ft 12-inch water main, which would stretch from Seeley Avenue, cross south under the I-57 overpass, and east onto 13th St. in Dixmoor. The project would also cap five other water mains in the area to help prevent future water main breaks.

Congresswoman Kelly celebrated the over $2M she helped secure for the project, which included funds from Bipartisan Infrastructure Law, the most significant commitment to public infrastructure the United States has made in decades.

“These investments are the very foundation of how we work, learn, and go about our daily lives,” said Rep. Kelly. “I have been fighting in Congress for the infrastructure needs of Dixmoor and all communities across Illinois’ Second Congressional District – and I’m committed to continuing this critical work.”

Prefer RiverBender on Google
Copyright 2026 Riverbender.com. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

More like this:

Duckworth Secures Illinois Water Priorities in Senate Committee-Passed WRDA Bill
Jul 16, 2026
Edwardsville Signals Progress In Major North Main Street Overhaul
Jul 10, 2026
Edwardsville Water Rates Set To Increase Nov. 1, 2026
Jul 10, 2026
Proposed West Alton, Mo., Ameren Plant Could Bring 1,000 Construction Jobs
2 days ago
St. Louis Sinkholes Shut Down Key I-70 Routes
Jun 14, 2026

 

Menu

Get the RiverBender App

Follow Us

Copyright © 2026 RiverBender.com All rights reserved.

primary

Privacy Policy | Editorial Policy | Fulfillment Policy