Log in | Sign Up

Road closure on U.S. 40 near Pocahontas, Glen Carbon's Keller set for work

Save
Listen to the story

POCAHONTAS -The Illinois Department of Transportation today announced that US 40 will be closed to all traffic 1.7 miles east of Pocahontas at the structure crossing the West Fork of Shoal Creek beginning at 12:01 AM on Monday, July 24, 2017, weather permitting. This work is necessary to replace the existing structure.

U.S. 40 is expected to reopen at this location by August 15, 2017.

Get The Latest News!

Don't miss our top stories and need-to-know news everyday in your inbox.

Sign in to hide this notification.

Article continues after sponsor message
Connect with Riverbend Readers - advertise with us today!!

A detour route will be posted utilizing Interstate 70 from the Pocahontas interchange (Exit 36) to the IL 127 interchange (Exit 41).

The general contractor on this project is Keller Construction Company of Glen Carbon, IL.

Follow our Twitter page to find details on other construction projects in IDOT’s District 8. Updates on the impacts to traffic are available at http://stl-traffic.org.

Prefer RiverBender on Google
Copyright 2026 Riverbender.com. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

More like this:

Attorney General Raoul Obtains Nine-Year Prison Sentence For Bond County Man Who Disseminated Child Sexual Abuse Material
Jun 11, 2026

 

Menu

Get the RiverBender App

Follow Us

Copyright © 2026 RiverBender.com All rights reserved.

primary

Privacy Policy | Editorial Policy | Fulfillment Policy