Log in | Sign Up

St. Clair County Transit District Awards Construction Contract For Phase I Of The Old Collinsville Road Trail To Hank’s Excavating & Landscaping, Inc.

Save Share
Listen to the story

MetroBikeLink SystemBELLEVILLE - After a competitive bidding process, St. Clair County Transit District (SCCTD) today announced Belleville-based Hank’s Excavating & Landscaping, Inc. was awarded a $767,952 construction contract for Phase I of the Old Collinsville Road Trail. This approximately ¾ mile-long trail project will connect Richland Creek Bikeway in Swansea to Lebanon Avenue in Belleville, as well as to the Old Collinsville Road Bike Trail Phase II project currently under construction from Lake Lorraine Drive to Munie Road in Swansea. This latest phase will further extend the reach of the MetroBikeLink System, which features 14 continuous miles of trails in Southwestern Illinois and links users to six Metro Transit Centers.

Phase I of the Old Collinsville Road Trail will feature a separate 10-foot-wide, shared-use, asphalt path within the Old Collinsville Road right of way; a pedestrian bridge over Richland Creek; and traffic signal modifications for safe crossing at Lebanon Avenue. It also will link Belleville’s existing sidewalk system along Old Collinsville Road and West Boulevard, providing pedestrian accommodations from Belleville East High School and approximately 2,000 homes nearby. The project is underway and is expected to be completed later this fall.

Get The Latest News!

Don't miss our top stories and need-to-know news everyday in your inbox.

Sign in to hide this notification.

“This project is one of several in the works designed to further connect our county’s growing trail system,” said Ken Sharkey, managing director for St. Clair County Transit District.

Article continues after sponsor message

The first section of the MetroBikeLink System opened in 2002 and was comprised of a four-mile trail, extending from Southwestern Illinois College to the Swansea MetroLink Station. Since then, the system has expanded to include the Memorial, Fairview Heights, and Shiloh Scott sections for a total of 14 miles of trail adjacent to the MetroLink light rail tracks. Additional trails have been built by SCCTD to connect to this main artery, including SCCTD Orchard Loop Trail Phases I and II, the Engelmann Park Connector, and the Old Collinsville Road Trail (currently under construction) totaling another eight miles of SCCTD connected trails. These accessible pathways, along with the connecting trails from other municipalities, will combine to provide over 35 miles of connected trails in St. Clair County.

Founded in 1981, St. Clair County Transit District contracts with Bi-State Development to provide public transportation services in St. Clair County, Ill., by way of 11 Metro Transit Centers; 12 MetroBus routes; on-demand, shared-ride services and more – connecting individuals to jobs, education, healthcare, entertainment, the MetroBikeLink and other destinations. Those with questions about service, they can call (618) 628-8090 between 8 a.m. and 4 p.m. Monday through Friday. For more information, visit www.scctd.org.

Prefer RiverBender on Google
Keep the Riverbend connected. Local news gives neighbors something to share, celebrate, and talk about. Your subscription helps keep those connections growing.
Support Local Journalism
Copyright 2026 Riverbender.com. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

 

More like this:

MetroLink Extension to MidAmerica Airport Completed After $192 Million Investment
Oct 14, 2026
Design Unveiled for Memorial Hospital Belleville Bus Stop Transformation
Oct 22, 2026
SCCTD Honors East St. Louis Transit Ambassador for Safety Leadership During Sauget Fire
Aug 30, 2026
St. Clair County Celebrates Opening of 4.5-Mile MetroBike Link Trail
Jul 7, 2026
St. Clair County Transit District to Open $6 Million MetroBikeLink Trail Extension on June 27, 2026
Jun 23, 2026